Project Data:

  • Location: Afyonkarahisar, Turkey

  • Client: Çimsa Sanayi Türk Inc

  • Main Contractor: Asya Construction

  • Total Pipe Insulation Area: 16,000 m2

  • Tonnage Capacity: 238 Ton 

  • Project Period: September, 2015 - October, 2016

  • Work Description: CERM-EX has been responsible for structural steel erection, pipes insulation and cladding installation of the factory. Within the scope of this project; 40 ton of pipes, 12 ton of profiles, 60 ton of cyclones and shots, and 135 tons of structural steel were locally shipped and assembled.