SALT FACTORY IN TURDA, ROMANIA

Project Data:

  • Location: Turda, Romania

  • Client: Sistemas Technology A.S.

  • Project Area: 5,300 m2

  • Project Period: Sep, 2019 - Feb, 2020

  • Tonnage Capacity: 200 Ton

  • Work Description: The salt factory was designed by our team and the fabrication of the steel structural elements took place in our steel fabrication facility. The project timeline was very challenging and to meet these time restrictions, we designed the structure using modular construction techniques to shorten the assembly process during the cold weather conditions in Turda and ensure our workers safety.
     